Environmental

Safeguarding our Environment for the Future

Environmental studies is a multidisciplinary academic field which systematically studies human interaction with the environment in the interests of solving complex problems. Environmental studies brings together the principles of the physical sciences, commerce/economics and social sciences so as to solve contemporary environmental problems. It is a broad field of study that includes the natural environment, the built environment, and the sets of relationships between them. The field encompasses study in basic principles of ecology and environmental science, as well as associated subjects such as ethics, geography, anthropology, policy, politics, law, economics, philosophy, sociology and social justice, planning, pollution control and natural resource management.

IESB can provide various environmental studies to cater to every clients needs whether for internal use or to comply with government regulations. Key studies we provide are listed below but not limited to:

  • Detailed Environmental Impact Assessment (Schedule 2) (DEIA)
  • Environmental Impact Assessment (Schedule 1) (EIA)
  • Environmental Monitoring Plan (EMP)
  • Environmental Monitoring Report (Post EIA Report)
  • Environmental Baseline Study (EBS)
  • Erosion Sediment Control Plan (ESCP)
  • Social Impact Assessment (SIA)

 

ENVIRONMENTAL STUDY IESB HAVE COMPLETED FOR RAPID

Document Client Approved Date
DEIA for the Proposed Refinery and Petrochemical Integrated Development (RAPID), Pengerang, Johor (RAPID DEIA). PETRONAS 27 August 2012
RAPID Phase 1 Erosion and Sediment Control Plan (ESCP) Proposed Refinery and Petrochemical Integrated Development (RAPID) in Pengerang, Johor (Phase 1 ESCP). PETRONAS 17 October 2012
EMP for the Proposed Refinery and Petrochemical Integrated Development (RAPID) in Pengerang, Johor (Phase 1 EMP). PETRONAS 22 October 2012
EMP Rev.1 (May 2013) for the Proposed Refinery and Petrochemical Integrated Development (RAPID) in Pengerang, Johor. PETRONAS 17 July 2013
Supplementary Report on ESCP for Phase 1 – Site Clearing & Preparation Stage [Package 1] – Revision 1 (ESCP Revision 1). PETRONAS 19 August 2013
Supplementary EMP for Phase 1 (Optional Areas). PETRONAS 19 March 2014
RAPID Phase 1 Optional Areas Erosion and Sediment Control Plan (ESCP). PETRONAS 31 March 2014
RAPID Phase 2 Erosion and Sediment Control Plan (ESCP). PETRONAS 8 April 2014
EMP for the Proposed Refinery and Petrochemical Integrated Development (RAPID) Phase 2 Site Clearing and Preparation (Phase 2 EMP). PETRONAS 29 April 2014
EMP for BAKAJ Waste Disposal Site Area A for the RAPID Phase 2 Site Clearing and Preparation. PETRONAS 18 November 2014
ESCP for BAKAJ Waste Disposal Site Area A for the RAPID Phase 2 Site Clearing and Preparation. PETRONAS 25 November 2014
DEIA for the Proposed Petrochemical Plants in the Refinery and Petrochemical Integrated Development (RAPID) Project, Pengerang, Johor (PETCHEM DEIA). PETRONAS 18 December 2014
IFC Gap Identification for RAPID Pengerang, Johor PETRONAS 26 June 2015
Groundwater Hydrological Regime Study 2 PETRONAS 1 October 2015